• Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
  • Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
  • Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
  • Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
  • Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
  • Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine

Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine

After-sales Service: Support
Warranty: 1 Year
Type: Crawler Excavator
Usage: Special Excavator, Mining Excavator, GM Excavator, Railway Machine
Bucket: Customized
Transmission: Hydraulic Transmission
Samples:
US$ 150000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
JG-LT
Drive Type
Internal Combustion Drive
Bucket Capacity
Customized
Size
Small-Scale
Certification
CE, ISO9001: 2000
Condition
New
MOQ
1 Set
Colour
Customized
Feature
Experienced Manufacturers
Transport Package
Naked Packing
Specification
6100*2200*2650mm
Trademark
JINGGONG
Origin
China

Product Description

Our company abides by the business philosophy of "quality first, customer first" to ensure product quality. We have rigorous production procedures, and each production process is carried out under strict quality inspection.Only after passing the inspection can they move on to the next procedure. At the same time, we insist on creating a neat, clean and safe working environment.
Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
SPECIFICATIONS
RANGE OF OPERATION Boom length 4200mm
Arm length 2000mm
Maximum Digging Reach 7400mm
Maximum Digging Depth 4500mm
Maximum Digging Force 90KN
Maximum Digging Height 7900mm
Maximum Dumping Height 5600mm
Back-end radius of gyration 2250mm
DIMENSION (Length*width*height) travel position 7500*2500*2920mm
Wheel base 2850mm
Track Gauge 1960mm
Width Of Crawler 500mm
Ground clearance of counterweight 940mm
Min ground clearance 420mm
TECHNICAL PARAMETERS Angle of rotation 360°
Machine weight 13500kg
Engine model YUCHAI
Rated Power 103KW
Rated Speed 2200r/min
Hydraulic system working pressure 28Mpa
Hydraulic system flow 270L/min
Variable piston pump 2*63ml/r
Max Hauling force 76.5KN
(High speed/Low speed) 5km/h/2.9km/h
Grade Climbing ability 70%/35°
Volume Of Bucket 0.5m3
Revolution Overdrive Pressure 25Mpa
Full circle swinging time 5.5s
Fqt Fuel Quantity ≥8L/h
Capacity Of The Fuel Tank 200L
Hydraulic Tank Capacity 200L

Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine
1. It has a compact structure, atmospheric appearance, stylish and beautiful appearance, more youthful vitality, light operation and good coordination.

2.Jingong Railway sleeper-changing machine is short and sophisticated, the scope of application of the venue is wider, the transfer is more convenient, the operation is simple, and the cost performance is high.

3.The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 

4.The grab can be customized according to the actual width of your local sleepers.We provide more optional parts to complete more kinds of work. We provide a variety of work tools such as grabs, forks, pulverizers, etc. to meet your various application needs. In addition, a variety of fixtures are provided to optimize the performance of the machine. The auxiliary hydraulic lines are arranged on the base of the boom, making the auxiliary hydraulic circuit easier to install, thereby reducing the time, parts and costs required for installing work tools. 

Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine

1.Strict quality management produce effective and stable products to meet customers' needs.

2. Strict detecting system and advanced inspection equipment.

3.Professional sales team, quality inspection & report, maritime logistics guidance.

4.We grants our clients a twelve-month-period or 2000-hours warranty for any machine purchased from us. 

5.We offer perfect facilities and comfortable environment and can provide training services to different users.
Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine


Railway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer MachineRailway Sleeper Replacement and Level The Ballast Use Jinggong Railway Sleeper Replacer Machine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now