• Rail Laying Machine Working in Railway Sleepers Changing
  • Rail Laying Machine Working in Railway Sleepers Changing
  • Rail Laying Machine Working in Railway Sleepers Changing
  • Rail Laying Machine Working in Railway Sleepers Changing
  • Rail Laying Machine Working in Railway Sleepers Changing
  • Rail Laying Machine Working in Railway Sleepers Changing

Rail Laying Machine Working in Railway Sleepers Changing

After-sales Service: Yes
Warranty: 1 Year
Type: Crawler Excavator
Usage: Rail Machine
Bucket: Grab Shovel
Transmission: Hydraulic Transmission
Samples:
US$ 50000/Set 1 Set(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
80L
Drive Type
Internal Combustion Drive
Bucket Capacity
0.1~0.5m³
Size
Small-Scale
Certification
ISO9001: 2000
Condition
New
Max. Opening Width of Grab
650mm
Transport Package
Nude Packing
Specification
6100*2200*2650mm
Trademark
JingGong
Origin
China
HS Code
8429521200
Production Capacity
3000 Units/ Year

Product Description

Rail Laying Machine Working in Railway Sleepers ChangingRail Laying Machine Working in Railway Sleepers Changing
Rail Laying Machine Working in Railway Sleepers Changing
SPECIFICATIONS
RANGE OF OPERATION Boom length 3300mm
Arm length 1850mm
Maimum digging force 45KN
Back-end radius of gyration 1800mm
Max. Opening Width of Grab 650mm
Min. Opening Width of Grab 200mm
Max. RADIUS Grabing Weight 0.5~0.6t
Max,Width of Grab 2800mm(customizable)
Grapple rotation angle 360°
DIMENSION (Length*width*height) travel position 6100*2800*2650mm
Wheel base 2600mm
Track Gauge 1570mm
Width Of Crawler 400mm
Ground clearance of counterweight 780mm
Min ground clearance 280mm
TECHNICAL PARAMETERS Applicable railway gauge 1435mm(customizable)
 efficiency ≥40pic/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI
Rated Power 48KW
Rated Speed 2200r/min
Hydraulic system working pressure 21Mpa
Hydraulic system flow 120L/min
Metering gear pump 2*28ml/r
Max Hauling force 45KN
(High speed/low speed) 4.5/2.5km/h
Grade Climbing ability 70%/35°
Volume Of Bucket 0.25m3
Revolution Overdrive Pressure 16Mpa
Full circle swinging time 5.5s
Fqt Fuel Quantity  ≥4L/h
Capacity Of The Fuel Tank 110L
Hydraulic Tank Capacity  110L

Company
Rail Laying Machine Working in Railway Sleepers Changing
Workshop
Rail Laying Machine Working in Railway Sleepers ChangingRail Laying Machine Working in Railway Sleepers Changing
Optional Device
Rail Laying Machine Working in Railway Sleepers ChangingWe provide more optional parts to complete more kinds of work. We provide a variety of work tools such as grabs, forks, pulverizers, etc. to meet your various application needs. In addition, a variety of fixtures are provided to optimize the performance of the machine. The auxiliary hydraulic lines are arranged on the base of the boom, making the auxiliary hydraulic circuit easier to install, thereby reducing the time, parts and costs required for installing work tools.


Process
Rail Laying Machine Working in Railway Sleepers Changing
Exhibition Show
Rail Laying Machine Working in Railway Sleepers Changing
Certificates
Rail Laying Machine Working in Railway Sleepers Changing

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Groups

Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
210
Year of Establishment
2006-07-03