Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway

Product Details
Customization: Available
Type: Crawler Excavator
Usage: Special Excavator
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
210
Year of Establishment
2006-07-03
  • Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
  • Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
  • Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
  • Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
  • Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
  • Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
Find Similar Products

Basic Info.

Model NO.
JG-80L
Transmission
Hydraulic Transmission
Drive Type
Internal Combustion Drive
Bucket Capacity
0.1~0.5m³
Size
Small-Scale
Certification
CE, ISO9001: 2000
Condition
New
Track Gauge
1570mm
Applicable Railway Gauge
1000mm~1435mm
Efficiency
≥40pic/H
Angle of Rotation
360°
Machine Weight
8000kgs
Transport Package
Nude Packing
Specification
6100*2200*2650mm
Trademark
JING GONG
Origin
China
HS Code
8479109900
Production Capacity
3000sets/Year

Product Description

QUANZHOU JINGLI ENGINEERING MACHINERY CO. LTD.

jg-excavator.en.made-in-china.com
Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
As the professional level of users is getting higher and higher, in order to meet the customer's demand for products,
Jingong Machinery constantly innovates and upgrades the products, and optimizes and improves the products from
the professional perspective of future development.
Since its establishment in 1997, Jingong has always been adhering to the business philosophy of "survive by quality,
rely on efficiency through management", put customers first, and develop and manufacture products that are popular
in the market.
Excavator Crawler Chinese with Sleeper Railway Maintenance Machinery
Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers RailwayHot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
 

JG80L RAILWAY SLEEPR CHANGER EXCAVATOR, which is special designed for railway track maintenance project,
we have successfully provided our machines to Chinese railway government projects, and Thailand railway government
projects, and some other countries. 

JG80L Railway Excavator with sleeper changer Specifications
Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway

SPECIFICATIONS
RANGE OF OPERATION Boom length 3300mm
Arm length 1850mm
Maimum digging force  45KN
Back-end radius of gyration 1800mm
Max. Opening Width of Grab 650mm
Min. Opening Width of Grab 200mm
Max. RADIUS Grabing Weight 0.5~0.6t
Max,Width of Grab 2800mm(customizable)
Grapple rotation angle 360°
DIMENSION (Length*width*height) travel position 6100*2800*2650mm
Wheel base 2600mm
Track Gauge 1570mm
Width Of Crawler 400mm
Ground clearance of counterweight 780mm
Min ground clearance 280mm
TECHNICAL PARAMETERS Applicable railway gauge 1435mm(customizable)
 efficiency ≥40pic/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI
Rated Power 48KW
Rated Speed 2200r/min
Hydraulic system working pressure 21Mpa
Hydraulic system flow 120L/min
Metering gear pump 2*28ml/r
Max Hauling force 45KN
(High speed/low speed) 4.5/2.5km/h
Grade Climbing ability 70%/35°
Volume Of Bucket 0.25m3
Revolution Overdrive Pressure 16Mpa
Full circle swinging time 5.5s
Fqt Fuel Quantity  ≥4L/h
Capacity Of The Fuel Tank 110L
Hydraulic Tank Capacity  110L

Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers RailwayHot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
   
JG80L excavator with sleeper changer is one of the railway maintenance work devices newly designed and produced by
our company.Compared with the large foreign pillow-changing machines, the high cost of purchasing the machine, Jingong
Railway pillow-changing machine is short and sophisticated, the scope of application of the venue is wider, the transfer is
more convenient, the operation is simple, and the cost performance is high.
Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
Jingong Railway Pillow Exchanger has a compact structure, atmospheric appearance, stylish and beautiful appearance,
more youthful vitality, light operation and good coordination. The machine has the characteristics of high operation
efficiency,  high construction safety and strong practicability. It is understood that because the sleepers of the railway
are made of reinforced concrete, the weight is as high as 400-500 kg.

Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers RailwayHot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
                     
The manual pillow replacement operation is slow and the safety is low. The operating efficiency after using the Jingong railway
pillow replacement machine can reach 20 manual workers. The average Each pillow changing machine can replace 1.5 pillows
per minute, which greatly reduces the labor management cost and improves the operation safety.

INSTRUCTIONS:
1.Clean up the ballast under the sleepers so as to stack the ballast that has been pulled out. 
2.Adjust the boom and arm, and place the ballast pull out device horizontally on the side of the sleeper. 
3.Ensure that the upper end of the chain is lower than the bottom of the sleeper 
4.Start the ballast removal motor (select high or low speed according to ballast slagging degree) 
5.Press the rotary cylinder button to rotate the ballast removal mechanism towards the inside of the sleeper. Pay attention to
the speed of rotation. If it is stuck, the slewing mechanism can be rotated in the reverse direction, and then continue to rotate in
the forward direction 
6.When there are too many ballast on the reverse side, the rotating ballast removal mechanism can be turned outward, and the
ballast can be discharged to the outside of the sleeper. 
7.When the skimming mechanism swings to the level of the sleeper, stops rotating. At this time, Operate the machine to move
backwards. 
8.After 5-10 meters on one side, put the ballast bag under the suspended sleepers and return to the starting point to start the
other side working 
9.When the ballast removing mechanism changes direction, raise the boom and the arm, and press the reverse button when
the slag removing mechanism is turned to the apex to complete the direction conversion.

Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
Our company abides by the business philosophy of "quality first, customer first" to ensure product quality.
We have rigorous production procedures, and each production process is carried out under strict quality
inspection.Only after passing the inspection can they move on to the next procedure. At the same time,
we insist on creating a neat, cleannd safe working environment.

Hot Sale Hydraulic Transmission New Jing Gong China Rail Road Machine Sleepers Railway
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier