Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing

Product Details
Customization: Available
After-sales Service: Support
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
210
Year of Establishment
2006-07-03
  • Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
  • Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
  • Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
  • Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
  • Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
  • Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
Find Similar Products

Basic Info.

Model NO.
JG120L
Usage
Special Excavator, Marine Excavator, Mining Excavator, GM Excavator
Bucket
Sleeper Changer
Transmission
Hydraulic Transmission
Drive Type
Internal Combustion Drive
Bucket Capacity
0.1~0.5m³
Size
Medium-Sized
Certification
CE, ISO9001: 2000
Condition
New
Transport Package
Nude Packing
Specification
6800*2260*2660mm
Trademark
JINGGONG
Origin
China
HS Code
8429521100
Production Capacity
3000units/Year

Product Description

JG80LT Crawler Excavator with sleeper changer
Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr ChangingRailway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr ChangingRailway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 
Its grab can be customized according to the actual width of customer's local sleepers.


Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing


Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing

Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing
Railway Maintenance Equipment Rail Crawler Excavator Track Machine Railway Sleepr Changing




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier