• Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
  • Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
  • Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
  • Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
  • Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
  • Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement

After-sales Service: Yes
Warranty: 1 Year
Customized: Customized
Certification: ISO9001
Type: Sleeper
(Length*Width*Height) Travel Position: 7500*2800*2920mm
Samples:
US$ 48000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
JG-LT
Gauge Base
2750mm
Track Gauge
1620mm
Width of Crawler
500mm
Ground Clearance of Counterweight
940mm
Min Ground Clearance
420mm
MOQ
1set
Transport Package
Nude Packing
Specification
7500*2800*2920mm
Trademark
JingGong
Origin
China
HS Code
8479109000
Production Capacity
3000 Units/ Year

Product Description

JG-LT Rail Machine Sleeper Layer Changer Excavator
 
                 This crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing
                 machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
                 The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 
                 Its grab can be customized according to the actual width of customer's local sleepers.
Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change ReplacementRailroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
SPECIFICATIONS
RANGE OF OPERATION Boom length 3300mm
Arm length 1850mm
Maimum digging force 45KN
Back-end radius of gyration 1800mm
Max. Opening Width of Grab 650mm
Min. Opening Width of Grab 200mm
Max. RADIUS Grabing Weight 0.5~0.6t
Max,Width of Grab 2800mm(customizable)
Grapple rotation angle 360°
DIMENSION (Length*width*height) travel position 7500*2800*2920mm
Axle base 2750mm
Track Gauge 1620mm
Width Of Crawler 500mm
Ground clearance of counterweight 940mm
Min ground clearance 420mm
TECHNICAL PARAMETERS Applicable railway gauge 1435mm(customizable)
 efficiency ≥40pic/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI
Rated Power 48KW
Rated Speed 2200r/min
Hydraulic system working pressure 21Mpa
Hydraulic system flow 120L/min
Metering gear pump 2*28ml/r
Max Hauling force 45KN
(High speed/low speed) 4.5/2.5km/h
Grade Climbing ability 70%/35°
Volume Of Bucket 0.25m3
Revolution Overdrive Pressure 16Mpa
Full circle swinging time 5.5s
Fqt Fuel Quantity  ≥4L/h
Capacity Of The Fuel Tank 110L
Hydraulic Tank Capacity  110L

Company

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement

Optional Device

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement

Workshop

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
Process
Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
Exhibition Show

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
Certificates

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now