This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers.
Its grab can be customized according to the actual width of customer's local sleepers.