• Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
  • Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
  • Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
  • Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
  • Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
  • Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator

Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator

After-sales Service: Yes
Warranty: 1 Year
Customized: Customized
Certification: ISO9001
Type: Railway Machine
(Length*Width*Height) Travel Position: 6100*2800*2650mm
Samples:
US$ 48000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
JG80L
Gauge Base
2600mm
Track Gauge
1570mm
Width of Crawler
400mm
Ground Clearance of Counterweight
780mm
Min Ground Clearance
280mm
MOQ
1set
Feature
Mature Technology
Transport Package
Nude Packing
Specification
6100*2800*2650mm
Trademark
JingGong
Origin
China
HS Code
8479109000
Production Capacity
3000 Units/ Year

Product Description

A track renewal train has a series of machinery units that are combined together into one train. As the track renewal train moves forward, the track renewal process will be done stage by stage to the completion of track renewal as it leaves the area. The first stage of track renewal is the removal of old sleepers.
Don't hesitate to contact us for your custom made offer for lastest new construction equipment or machinery.
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
 
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 
Its grab can be customized according to the actual width of customer's local sleepers.
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
SPECIFICATIONS
RANGE OF OPERATION Boom length 3300mm
Arm length 1850mm
Maimum digging force 45KN
Back-end radius of gyration 1800mm
Max. Opening Width of Grab 650mm
Min. Opening Width of Grab 200mm
Max. Radius Grabing Weight 0.5~0.6t
Max,Width of Grab 2800mm(customizable)
Grapple rotation angle 360°
DIMENSION (Length*width*height) travel position 6100*2800*2650mm
Gauge base 2600mm
Track Gauge 1570mm
Width Of Crawler 400mm
Ground clearance of counterweight 780mm
Min ground clearance 280mm
TECHNICAL PARAMETERS Applicable railway gauge 1435mm(customizable)
efficiency ≥40pic/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI
Rated Power 48KW
Rated Speed 2200r/min
Hydraulic system working pressure 21Mpa
Hydraulic system flow 120L/min
Metering gear pump 2*28ml/r
Max Hauling force 45KN
(High speed/low speed) 4.5/2.5km/h
Grade Climbing ability 70%/35°
Volume Of Bucket 0.25m3
Revolution Overdrive Pressure 16Mpa
Full circle swinging time 5.5s
Fqt Fuel Quantity ≥4L/h
Capacity Of The Fuel Tank 110L
Hydraulic Tank Capacity 110L
                     
    
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator


 












 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now