• Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
  • Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
  • Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
  • Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
  • Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
  • Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track

Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track

After-sales Service: Support
Warranty: 1 Year
Type: Crawler Excavator
Usage: Special Excavator
Bucket: Customized
Transmission: Hydraulic Transmission
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
JG-LT
Drive Type
Internal Combustion Drive
Bucket Capacity
Customized
Size
Small-Scale
Certification
ISO9001: 2000
Condition
New
MOQ
1 Set
Color
Customized
Transport Package
Nude Packing
Specification
6100*2800*2650mm
Trademark
JingGong
Origin
China
HS Code
8429521200
Production Capacity
3000units/ Year

Product Description

Sleeper Changer on Road-Rail-Excavator Exchanging Single Concrete Sleepers
Our company abides by the business philosophy of "quality first, customer first" to ensure product quality. We have rigorous production procedures, and each production process is carried out under strict quality inspection.Only after passing the inspection can they move on to the next procedure. At the same time, we insist on creating a neat, clean and safe working environment.
Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.

The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 
Its grab can be customized according to the actual width of customer's local sleepers
.Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
SPECIFICATIONS
SLEEPER CHANGER ATTACHMENT Max. opening width of grab 650mm
Min. opening width of grab 200mm
Max. radius grabing weight 0.5~0.6t
Max. width of grab 2800mm(customizable)
DIMENSIONS (Length*width*height) Transport dimensions 6100*2800*2650mm
Axle base 2600mm
Track gauge 1570mm
Width of crawler 400mm
Ground clearance of counterweight 780mm
Min. ground clearance 280mm
TECHNICAL PARAMETERS Applicable railway gauge customizable
Working efficiency ≥40pcs/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI
Rated power 48KW~55KW
Rated speed 2200r~2300r/min

Innovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail TrackInnovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail TrackInnovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail TrackInnovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail TrackInnovative Rail Laying Equipment and Sleeper Handling Distributor Excavator Machine Change Rail Track
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now