• New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale
  • New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale
  • New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale
  • New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale
  • New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale
  • New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale

New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale

After-sales Service: Support
Warranty: 1 Year
Type: Wheel Excavator
Usage: Special Excavator
Bucket: Grapple with Sleeper Changer
Transmission: Hydraulic Transmission
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
JG80ST
Drive Type
Internal Combustion Drive
Bucket Capacity
0.1~0.5m³
Size
Small-Scale
Certification
CE, ISO9001: 2000
Condition
New
Track Gauge
1570mm
Applicable Railway Gauge
1000mm~1435mm
Efficiency
≥40pic/H
Angle of Rotation
360°
Machine Weight
8000kgs
Transport Package
Nude Packing
Specification
6100*2200*2650mm
Trademark
JING GONG
Origin
China
Production Capacity
3000sets/Year

Product Description

JG80ST RAILWAY SLEEPR CHANGER EXCAVATOR, which is special desiged for railway track mentainance project, we have successfully provided our machines to Chinese railway govement projects, and Thailand railway govement projects, and some other countires. 

1.Clean up the ballast under the sleepers so as to stack the ballast that has been pulled out. 
2.Adjust the boom and arm, and place the ballast pull out device horizontally on the side of the sleeper. 
3.Ensure that the upper end of the chain is lower than the bottom of the sleeper 
4.Start the ballast removal motor (select high or low speed according to ballast slagging degree) 
5.Press the rotary cylinder button to rotate the ballast removal mechanism towards the inside of the sleeper. Pay attention to the speed of rotation. 
If it is stuck, the slewing mechanism can be rotated in the reverse direction, and then continue to rotate in the forward direction 
6.When there are too many ballast on the reverse side, the rotating ballast removal mechanism can be turned outward, and the ballast can be discharged to the outside of the sleeper. 
7.When the skimming mechanism swings to the level of the sleeper, stops rotating. At this time, Operate the machine to move backwards. 
8.After 5-10 meters on one side, put the ballast bag under the suspended sleepers and return to the starting point to start the other side working 
9.When the ballast removing mechanism changes direction, raise the boom and the arm, and press the reverse button when the slag removing mechanism is turned to the apex to complete the direction conversion.

JG80ST Railway Excavator with sleeper changer Specifications

Range of operation 
Boom length 3320mm
Arm length 1850mm
Maximum Digging Force 45KN
Back-end radius of gyration 1750mm
(Length*width*height)Transport Dimensions
(Length*width*height)Transport Dimensions 6100*2200*2650mm
Wheel base 2900mm
Track Gauge 1570mm
Width Of Crawler 400mm
Ground clearance of counterweight 780mm
Min ground clearance 280mm
Tech performance and specification
Applicable railway gauge 1435mm
efficiency ≥40pic/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI(III)
Rated Power 48KW
Rated Speed 2200r/min
Hydraulic system working pressure 21Mpa
Hydranlic system flow 120L/min
Variable piston pump 28ml*2/r
Walking speed(High speed/low speed) 4.5/2.5km/h
Grade Climbing ability 70%/35°
Volume Of Bucket 0.25m3
Swing Overload Pressure 16Mpa
Full circle swinging time 5.5s
Fqt Fuel Quantity  ≥4L/h
Capacity Of The Fuel Tank 110L
Hydraulic Tank Capacity  110L



New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale
New Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in SaleNew Design Railroad Tie Replacement Equipment Jg80st Railway Sleeper Replacer Machine in Sale







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now